首页> 外文期刊>Hydro review >Energy Policy Act of 2005 and the Interim Agency Rules:Industry Hopes that Rulemaking will Improve Hearing Procedures
【24h】

Energy Policy Act of 2005 and the Interim Agency Rules:Industry Hopes that Rulemaking will Improve Hearing Procedures

机译:2005年《能源政策法》和《临时机构规则》:工业界希望规则制定能改善听证程序

获取原文
获取原文并翻译 | 示例
           

摘要

The Energy Policy Act of 2005 had a significant impact on hydro relicensings before the Federal Energy Regulatory Commission. Under Section 241 of this act, a licensee or any party to a licensing proceeding may, through a trial-type hearing, challenge the factual basis of agency terms and conditions that licensees were previously forced to accept.Licensees may also propose alternative conditions for agency consideration. The EPAct procedures are the first opportunity licensees have ever had to dispute agency conditions and prescriptions before they are incorporated into a FERC license.
机译:2005年《能源政策法》对联邦能源管理委员会的水电许可产生了重大影响。根据该法案第241条的规定,被许可人或许可程序的任何一方都可以通过审理听证会,对先前被迫接受许可的代理机构条款和条件的事实依据提出异议。考虑。 EPAct程序是被许可人在将其纳入FERC许可之前有史以来第一次对代理机构的条件和处方提出异议的机会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号