Upgrading Tainter Gate Hoist Arrangements at Tillery Dam

机译:提勒河大坝的Tainter提升机布置升级

获取原文
获取原文并翻译 | 示例
           

摘要

Although the hoists and roller chains used to raise and lower the 18 tainter gates at the 84-MW Tillery hydro project operated reliably for eight decades, they eventually reached the end of their useful lives. A needed tainter gate upgrade project prompted owner Progress Energy to investigate alternatives for replacing the chains to allow for reliable gate operation during this rehab. Progress Energy replaced the roller chain sprocket arrangement with disc layered wire rope drums that wind on themselves and fit the existing footprint of the tainter gate hoists. Nine gates have been retrofit to date, and ProgressEnergy is preparing to begin its tainter gate upgrade work at Tillery.
机译:尽管用于提升和降低84兆瓦Tillery水电项目中的18个污染门的提升机和滚子链可靠地运行了八十年,但它们最终达到了使用寿命。需要进行的排污门升级项目促使业主Progress Energy研究更换链条的替代方法,以便在修复过程中可靠地操作闸门。 Progress Energy用盘状分层钢丝绳鼓代替了滚子链轮装置,该盘绕在其自身上并适合吸气门启闭机的现有占地面积。迄今为止,已经对9个登机口进行了翻新,ProgressEnergy正在准备在蒂勒(Tillery)开始其污染门的升级工作。

著录项

  • 来源
    《Hydro review》 |2011年第6期|p.5456-57104|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号