【24h】

Tech Briefs

机译:技术简介

获取原文
获取原文并翻译 | 示例
           

摘要

The new upstream fish ladder at the 94-MW Thompson Falls hydro project in Thompson Falls, Mont., opened in May 2011 with a successful first run, reports GEI Consultants Inc., the firm selected by PPL Montana to provide ecological and engineering services for the project.The $7.5 million project is designed to provide rare species of trout and other fish varieties unhindered access to hundreds of miles of the upstream Clark ForkRiver and its tributaries. The steel and concrete ladder system has 48 step pools that will permit fish to gradually ascend about 75 feet to the top of, and over, the dam. It is the first full-height fish passage ladder in the U.S. built specifically for bull trout, a threatened species.
机译:GEI Consultants Inc.报告说,位于蒙大拿州汤普森福尔斯的94兆瓦汤普森福尔斯水电项目的新上游鱼梯于2011年5月启用,GEI Consultants Inc.是PPL蒙大纳州选择为该公司提供生态和工程服务的公司这项耗资750万美元的项目旨在为鳟鱼和其他鱼类品种的稀有物种提供不受阻碍地进入上游数百英里的克拉克福克河及其支流的通道。钢制和混凝土梯子系统有48个阶梯池,使鱼类可以逐渐上升到大坝顶部和上方约75英尺。它是美国首个专为濒危物种公鳟建造的全高鱼道梯子。

著录项

  • 来源
    《Hydro review》 |2011年第6期|p.626466-67|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号