...
首页> 外文期刊>Hydro review >Adding Hydro to Existing Dams: The Story of Arkansas' White River Projects
【24h】

Adding Hydro to Existing Dams: The Story of Arkansas' White River Projects

机译:在现有大坝上增加水电:阿肯色州白河项目的故事

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Three new small hydro plants are now operating at existing dams on the White River in Arkansas. The story of their development illustrates the challenges and rewards of building new hydro in the United States. Development of 12 megawatts of new hydropower capacity in Arkansas involved a utility, a college, a city, a county, the U.S. Congress, 27 years, a myriad of engineers and lawyers, and lots of tenacity and perseverance by a dedicated group of individuals. On July 20, 2007, county, state, and federal government officials dedicated three new hydroelectric plants at existing dams on a 20-mile stretch of the White River in Arkansas: 1. 4.3-MW White River Lock and Dam No. 1 plant at Lock and Dam No. 1; 2. 3.9-MW White River Lock and Dam No. 2 plant at Lock and Dam No. 2; and 3. 4.3-MW Shelby M. Knight Hydro Plant at Lock and Dam No. 3. The $32 million, three-powerhouse project is a developmental enterprise of Independence County, Ark., in association with the city of Batesville, Ark., and Lyon College of Batesville.
机译:阿肯色州怀特河的现有大坝目前正在运营三个新的小型水力发电厂。它们的发展故事说明了在美国建设新水电的挑战和收获。阿肯色州12兆瓦新水电容量的开发涉及公用事业,一所大学,一个城市,一个县,美国国会,长达27年的历史,无数的工程师和律师,以及一群敬业的人的坚韧和毅力。 2007年7月20日,县,州和联邦政府官员在阿肯色州怀特河20英里长的现有大坝上新建了三座水力发电厂:1. 4.3兆瓦怀特河水闸和1号大坝1号锁和水坝; 2. 3.9兆瓦的怀特河洛克和2号大坝电厂,位于洛克和2号大坝; 3.锁定和大坝3号的4.3兆瓦Shelby M. Knight水力发电厂。这个耗资3200万美元的三电站项目是阿肯色州独立县的发展企业,与阿肯色州的贝茨维尔市合作,和贝茨维尔里昂学院。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号