...
首页> 外文期刊>Hydrotechnical Construction >Formation of a winter Polynya in the lower pools of hydroelectric stations
【24h】

Formation of a winter Polynya in the lower pools of hydroelectric stations

机译:在水力发电站下部水池中形成冬季Polynya

获取原文
获取原文并翻译 | 示例
           

摘要

One of the most unfavorable operating factors of hydrostations is the formation of a polynya downstream of the dam in the winter. Intense evaporation of water under conditions of sever cold creates extremely unfavorable conditions for people along the entire length of the polynya. Therefore a prediction of the dynamics of its spread is of considerable interest for hydrotechnical construction practice. The existing recommendations on the size of a polynya [1] suffer some uncertainty with respect to assigning design values and approaches to a determination of its parameters.
机译:水电站最不利的运行因素之一是在冬季大坝下游形成波利尼亚河。在严寒的条件下强烈的水蒸发会给沿岸的人们带来极为不利的条件。因此,对于水力建筑实践,对其扩散动力学的预测是相当有意义的。现有的关于polynya大小的建议[1]在分配设计值和确定其参数的方法方面存在一些不确定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号