首页> 外文期刊>Hydrotechnical Construction >Special works during construction of the zagorsk pumped-storage station
【24h】

Special works during construction of the zagorsk pumped-storage station

机译:扎戈尔斯克抽水蓄能站建设期间的特殊工程

获取原文
获取原文并翻译 | 示例
           

摘要

Special works during construction of the zagorsk pumped-storage station (PSS) were carried out by the Zagorsk section of the Moscow specialized administration of the All-Union Association for Special Hydrotechcical Works (Gidrospetsstroi). The special works began in 1976, almost from the start of the general construction works. Because the geological and hydrogeological conditions at the construction site were relatively complex, numer- Ous special works were planned and executed, including pile works during construction of industrial and civil objects; Pile works when constructing the base of the penstocks; groundwater lowering works; other works of insignificant Volumes: sealing the joints of penstocks, construction of vertical drains, construction of sheet-pile diaphragms in the Abutments to the powerhouse and water intake, and grouting of cavities in the scroll casings of the units.
机译:扎戈尔斯克抽水蓄能站(PSS)的建设期间的特殊工程是由全联盟特殊水技术工程协会(Gidrospetsstroi)莫斯科专门管理局的扎戈尔斯克分部进行的。特殊工程始于1976年,几乎是从一般建筑工程开始的。由于施工现场的地质和水文地质条件相对复杂,因此计划并执行了数项特殊工程,包括在工业和民用建筑中进行的桩工;建造压力管基础时要进行桩工;地下水降低工程;其他无关紧要的工作:密封压力管道的接缝,建造垂直排水装置,在通往动力室和进水口的桥台上建造板桩式隔膜,以及在单元的涡旋式壳体中灌浆空腔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号