...
首页> 外文期刊>Power Engineering Review, IEEE >Optimal Scheduling of Large Hydrothermal Power Systems
【24h】

Optimal Scheduling of Large Hydrothermal Power Systems

机译:大型水火发电系统的优化调度

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper we present a new algorithm to find the optimal unit commitment and economic dispatch (UC/D) for a large hydrothermal power system. Mathematically, this is a large nonlinear, mixed integer optimization problem involving over 16,800 integer variables for a system having 100 thermal units with a 1-week scheduling horizon. We use a dual programming approach to solve a separate optimal control problem for each thermal unit and for each set of coupled hydro units. The algorithm has been tested on a 100 thermal unit/6 hydro unit system having a 168-hour scheduling period, and will find solutions that are within 0.1 to 0.25 percent of the optimal dual cost. We report computational results for a system modeled after the New York Power Pool.
机译:在本文中,我们提出了一种新的算法,可以找到大型水火发电系统的最佳机组承诺和经济调度(UC / D)。从数学上讲,这是一个大的非线性混合整数优化问题,对于具有100个热力单元且调度周期为1周的系统,涉及超过16,800个整数变量。我们使用双重编程方法来解决每个热力单元和每套耦合水力单元的单独最优控制问题。该算法已在具有168小时调度周期的100热力单元/ 6水力单元系统上进行了测试,将找到在最佳双重成本的0.1%至0.25%之内的解决方案。我们报告以纽约电力池为模型的系统的计算结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号