...
首页> 外文期刊>Power Engineering Review, IEEE >Standardized SCADA-AGC System Effect on System Cost, Delivery and Quality
【24h】

Standardized SCADA-AGC System Effect on System Cost, Delivery and Quality

机译:标准化的SCADA-AGC系统对系统成本,交付和质量的影响

获取原文
获取原文并翻译 | 示例
           

摘要

This paper describes a new Northern States Power Company SCADA-AGC system and the effects of being forced, by time and economic constraints to purchase highly standardized vendor hardware and software. Using the approach that no changes would be made to the vendor's standard system unless abslutely essential to Northern States Power Company's operation, a 250-station SCADA-AGC system was delivered 14 months after contract signing. The use of standard systems requires a careful study of tradeoffs between company standards and cost and time savings. The use of existing hardware and the manner in which it will affect the vendor's standard products must be carefully considered. It is important that the customer and the vendor share a mutual understanding of project definition and scope. The vendor must keep in mind what the customers goals are and the customer must realize the impact of changes on the vendors standard system. These restrictions require a strong sense of timing and cooperation on the part of both the customer and the vendor project team members. The effects of standard systems on project definition, development, implementation and use will be discussed.
机译:本文介绍了一种新的北方邦电力公司SCADA-AGC系统,以及受时间和经济限制而被迫购买高度标准化的供应商硬件和软件的后果。除非绝对对北方邦电力公司的运营至关重要,否则采用不会对供应商的标准系统进行任何更改的方法,在合同签订后的14个月内交付了250站的SCADA-AGC系统。使用标准系统需要仔细研究公司标准与节省成本和时间之间的权衡。必须仔细考虑现有硬件的使用及其对供应商标准产品的影响。客户和卖方必须对项目定义和范围有共同的了解,这一点很重要。供应商必须牢记客户的目标是什么,客户必须意识到变更对供应商标准系统的影响。这些限制要求客户和供应商项目团队成员都具有强烈的时机和合作意识。将讨论标准系统对项目定义,开发,实施和使用的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号