...
首页> 外文期刊>IEEE Transactions on Knowledge and Data Engineering >Knowledge-based approaches for scheduling problems: a survey
【24h】

Knowledge-based approaches for scheduling problems: a survey

机译:基于知识的计划问题的方法:一项调查

获取原文
获取原文并翻译 | 示例
           

摘要

Recent developments in artificial intelligence (AI) have led to the use of knowledge-based techniques for solving scheduling problems. The authors survey several existing intelligent planning and scheduling systems with the aim of providing a guide to the main AI techniques used. In view of the prevailing difference is usage of the terms planning and scheduling between AI and operations research (OR), a taxonomy of planning and scheduling problems is presented. The modeling of real world problems from closed deterministic worlds to complex real worlds is illustrated with a project scheduling example. Some of the more successful planning and scheduling systems are surveyed, and their features are highlighted. The AI approaches are consolidated into knowledge representation and problem solving in the project management context.
机译:人工智能(AI)的最新发展已导致使用基于知识的技术来解决调度问题。作者调查了几种现有的智能计划和调度系统,旨在为所使用的主要AI技术提供指南。鉴于当前的主要区别是在AI和运筹学(OR)之间使用了计划和调度术语,因此提出了计划和调度问题的分类法。从项目确定的示例说明了从封闭的确定性世界到复杂的现实世界的现实世界问题的建模。对一些比较成功的计划和调度系统进行了调查,并突出了它们的功能。在项目管理环境中,人工智能方法被整合为知识表示和问题解决。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号