1. The number of restarted nuclear power plants in Japan stood at nine as of December 2018. Units 6 and 7 of Tokyo Electric Power Co.'s Kashiwazaki-Kariwa Nuclear Power Station are in the final examination stage toward their restart, after acquiring approvals of the safety design from the Nuclear Regulation Authority (NRA) in December 2017. The Japan Atomic Power Company won NRA approval on the lifetime extension of its Tokai No. 2 Power Station in November 2018, planning to install additional safety devices as approved in the future. It is uncertain when the 10 plants now under safety examinations will be restarted with the examinations completed. The number of restarted nuclear power plants at the end of FY2019 may be at most 11.
机译:1.截至2018年12月,日本已重启的核电站数量为9个。东京电力公司柏崎-ari轮核电站的6号和7号机组在获得批准后正处于重新启动的最后审查阶段核监管局(NRA)于2017年12月发布的安全设计报告。日本原子能公司于2018年11月延长了Tokai第二电站的使用寿命,并获得了NRA批准,计划安装该设备中已批准的其他安全装置。未来。尚不确定何时将接受安全检查的10个工厂在检查完成后重新启动。到2019财年末,重新启动的核电站数量可能最多为11。

著录项

  • 来源
    《IEEJ energy journal》 |2019年第1期|31-33|共3页
  • 作者

    Tomoko Murakami;

  • 作者单位

    Nuclear Energy Group, Strategy Research Unit, The Institute of Energy Economics, Japan;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号