...
首页> 外文期刊>Inside FERC >Increase in wind projects, state RPS programs spur plans for big power lines, says panel
【24h】

Increase in wind projects, state RPS programs spur plans for big power lines, says panel

机译:专家小组说,风电项目增加,州RPS计划刺激了大型电力线的计划

获取原文
获取原文并翻译 | 示例
           

摘要

A boom in wind power projects and state renewable portfolio standards, not incentive rates, have been the triggers behind proposals for major high-voltage transmission projects, the president of a merchant generator said last week.rnWhen Congress passed the Energy Policy Act in 2005, Trudy Harper, president of Tenaska Power Services, thought the promise of incentive rate treatment would cause a big increase in high-voltage transmission line proposals. But now she realizes "the watershed is coming in the most interesting way," from a need to integrate wind, she told a Washington conference hosted by Quanta Services.
机译:一家商业发电机的总裁上周表示,风电项目和国家可再生能源投资组合标准(而不是激励率)的繁荣是大型高压输电项目提议背后的诱因。当国会在2005年通过《能源政策法》时,特纳斯卡电力服务公司总裁特鲁迪·哈珀(Trudy Harper)认为,奖励税率待遇的承诺将导致高压输电线路方案的大量增加。但是,她在Quanta Services主办的华盛顿会议上意识到,由于需要整合风能,“分水岭正在以最有趣的方式来临”。

著录项

  • 来源
    《Inside FERC》 |2008年第27期|10|共1页
  • 作者

    Esther Whieldon;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号