首页> 外文期刊>Interavia >Halfway to PAK FA
【24h】

Halfway to PAK FA

机译:PAK FA的中途

获取原文
获取原文并翻译 | 示例
           

摘要

Sukhoi is set to ramp up full-scale development work on the new Su-35 fighter, which it has designated the T-10BM, Bolshaya Modernizatsiya or Major Modernization. At times this programme has been also known as Su-35BM, as opposed to former versions of Su-35. The Su-35BM is intended to close the time gap between the current production Su-30MK or other versions of upgraded Su-27SM fighters, and the new-generation PAK FA fighter, which is expected to enter production around 2011-2012. This is the reason for the date of 2007 announced by Sukhoi as the deadline for completion of work on the Su-35 and its availability for sale. The Su-35BM is defined in Russia as "generation 4++ fighter", which in real terms means second-stage modernization of the Su-27 fighter (Su-27 is generation 4; present versions Su-27SM and Su-30MK are generation 4+, whereas PAK FA is defined as generation 5).
机译:苏霍伊将加强对新型Su-35战斗机的全面开发工作,该战斗机已被指定为T-10BM,Bolshaya Modernizatsiya或Major Modernization。有时该程序也被称为Su-35BM,与以前的Su-35版本相反。 Su-35BM旨在缩小当前生产的Su-30MK或其他版本的升级版Su-27SM战斗机与新一代PAK FA战斗机之间的时间间隔,后者有望于2011-2012年左右投入生产。这就是Sukhoi宣布将2007年作为Su-35的工作完成和销售的截止日期的原因。 Su-35BM在俄罗斯被定义为“第4代++战斗机”,这实际上意味着Su-27战斗机的第二阶段现代化改造(Su-27是第4代;目前的Su-27SM和Su-30MK是第4代以上,而PAK FA定义为第5代)。

著录项

  • 来源
    《Interavia》 |2004年第676期|p.38-41|共4页
  • 作者

    PIOTR BUTOWSKI;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 航空;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号