Improving the efficacy of delay notification process of construction projects in Sri Lanka

机译:提高斯里兰卡建设项目延迟通知过程的功效

获取原文
获取原文并翻译 | 示例
           

摘要

Construction delays are a common phenomenon in construction projects that adversely affecting the time and cost targets of those projects. When there are delays, contractors tend to submit delay claims seeking time and cost adjustments to their contracts. Quite often, these claims are denied upfront due to deficiencies in the delay notification process itself. The vagueness of and ambiguities in contractual provisions too protract the notification process. This study was aimed to improve the level of success of delay claims submitted by the contractors working in the Sri Lankan construction projects that are administered in accordance with FIDIC 1999. The data required for the study were collected from a total of 248 projects, using a mix of qualitative and quantitative approaches. The study reveals that the effectiveness of the delay notification process can be improved by identifying the delay events well in advance. To overcome the flaws of the delay notification process, it is also equally important for the contractors to be aware of contractual provisions.
机译:建设延误是建设项目中的常见现象,对这些项目的时间和成本目标产生不利影响。当有延误时,承包商倾向于提交延迟索赔寻求时间和成本调整的合同。通常,由于延迟通知过程本身的缺陷,这些索赔被拒绝否定。合同规定中的含糊不清和歧义也过于延伸通知过程。本研究旨在提高工作在斯里兰卡建设项目的承包商提交的延迟索赔的成功水平,该项目根据FIDIC 1999进行管理。使用A的项目总共收集研究所需的数据混合定性和定量方法。该研究表明,通过提前识别延迟事件,可以提高延迟通知过程的有效性。为了克服延迟通知过程的缺陷,承包商要意识到合同规定也同样重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号