...
首页> 外文期刊>International Journal on Hydropower & Dams >Belorechensk upgraded in Krasnodar, Russia
【24h】

Belorechensk upgraded in Krasnodar, Russia

机译:Belorechensk在俄罗斯克拉斯诺达尔升级

获取原文
获取原文并翻译 | 示例
           

摘要

Lukoil, Russia's multinational oil and gas producer, and, has commissioned a 24 MW unit at the 48 MW Belorechensk hydropower plant on the river Belaya in the North Caucasus region of Krasnodar in southern Russia. The unit, which received a complete overhaul including replacement of the turbine and generator, increasing its capacity by 50 per cent from 16 MW, is now supplying power to the national wholesale power market, Russia's second largest oil producer announced on 21 January.
机译:俄罗斯的跨国石油和天然气生产商卢克石油公司(Lukoil)已在俄罗斯南部克拉斯诺达尔北高加索地区别拉亚河上48兆瓦的别洛列琴斯克水电站投产了24兆瓦机组。俄罗斯第二大产油国于1月21日宣布,该机组已经进行了全面检修,包括更换涡轮机和发电机,并将其容量从16兆瓦提高了50%,目前正在向全国批发电力市场供电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号