...
首页> 外文期刊>International Journal on Hydropower & Dams >Wausau dam in Wisconsin, USA, is to be refurbished
【24h】

Wausau dam in Wisconsin, USA, is to be refurbished

机译:美国威斯康星州的沃索水坝将被翻新

获取原文
获取原文并翻译 | 示例
           

摘要

Wisconsin Public Service (WPS) was beginning to upgrade the dam at its 5.4 MW Wausau hydropower facility on the river Wisconsin as we went to press (May). The upgrade project, which is scheduled to be completed by the end of 2019, will include the installation of three new gates, as well as a new gate heater for winter operation, improvements to the dam's concrete piers and upgrades to the spillway electrical system, according to an announcement on 15 April. WPS said it had completed a project assessment and engineering detail in 2018 to replace three original tainter gates on the dam to reduce leakage, improve plant efficiency and reduce operation and maintenance costs.
机译:在我们付印之时(5月),威斯康星州公共服务局(WPS)开始对位于威斯康星州河上的5.4兆瓦Wausau水电设施的大坝进行升级。升级项目计划于2019年底完成,将包括安装三个新的闸门,以及一个用于冬季运行的新闸门加热器,对大坝的混凝土墩进行改进以及对溢洪道电气系统进行升级,根据4月15日的公告。 WPS表示,它已在2018年完成了项目评估和工程细节,以更换大坝上的三个原始污染门,以减少泄漏,提高工厂效率并降低运营和维护成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号