...
首页> 外文期刊>International Journal on Hydropower & Dams >Mottec plant set for modernization in Switzerland
【24h】

Mottec plant set for modernization in Switzerland

机译:Mottec工厂计划在瑞士进行现代化改造

获取原文
获取原文并翻译 | 示例
           

摘要

Swiss hydropower plant operator Les Forces Motrices de la Gougra is to refurbish three units of the 69 MW Mottec storage power station in the southwestern canton of Valais. Modernization of the plant in Val d'Anniviers, at an estimated cost of CHF 31.2 million (US$ 31.6 million), will boost its installed capacity by 18 MW to 87 MW and its annual output by 5 GWh, equivalent to the average electricity consumption of 1400 households, the company's majority shareholder Alpiq announced on 9 July. In addition, the refurbishment will extend the control range of the plant, which will enhance its ability to provide ancillary services to the national grid, it added.
机译:瑞士水力发电厂运营商Les Forces Motrices de la Gougra将翻新瓦莱州西南部69兆瓦Mottec蓄能电站的三个机组。 Val d'Anniviers电厂的现代化改造,估计成本为3120万瑞士法郎(3160万美元),将使其装机容量增加18兆瓦,达到87兆瓦,年产量增加5吉瓦时,相当于平均用电量该公司的大股东Alpiq于7月9日宣布,将拥有1400户家庭。此外,翻新工程将扩大电厂的控制范围,从而增强其为国家电网提供辅助服务的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号