...
首页> 外文期刊>International Journal on Hydropower & Dams >RusHydro begins construction of small plants on the Kuban river
【24h】

RusHydro begins construction of small plants on the Kuban river

机译:RusHydro开始在库班河上建造小型工厂

获取原文
获取原文并翻译 | 示例
           

摘要

Construction went ahead recently of two small hydropower plants with a combined installed capacity of 50 MW on the river Kuban in Kara-chay-Cherkessia Republic in the North Caucasus region of Southern Russia. The Krasnogorskaya 1 and 2 stations, with an installed capacity of 24.9 MW and annual output of 83.8 GWh each, are designed to improve the hydrological regime of the river, lifting limitations on the capacity of the upstream 140 MW Zelenchukskaya hybrid hydropower plant, which combines conventional hydropower and pumped storage, and which is currently fixed at 70 MW. RusHydro has announced. The optimization of the river's regime will increase annual output of the Kuban Cascade by 230 GWh, according to the utility. The new facilities are scheduled to be commissioned in 2021-2022,
机译:最近,俄罗斯南部北高加索地区的Kara-chay-Cherkessia Republic的Kuban河上建设了两个装机容量总计为50 MW的小型水电站。 Krasnogorskaya 1和2站的装机容量为24.9 MW,年发电量分别为83.8 GWh,旨在改善河流的水文状况,解除对上游140 MW Zelenchukskaya混合水力发电厂的容量限制常规水力发电和抽水蓄能,目前固定为70兆瓦。 RusHydro已宣布。该公用事业公司称,河流治理的优化将使库班河瀑布的年产量增加230 GWh。新设备计划于2021-2022年投入使用,

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号