...
首页> 外文期刊>International Journal on Hydropower & Dams >The first of three renovated unit is commissioned at Baira Siul, India
【24h】

The first of three renovated unit is commissioned at Baira Siul, India

机译:翻新的三个单元中的第一个在印度的Baira Siul投产

获取原文
获取原文并翻译 | 示例
           

摘要

Bharat Heavy Electricals Ltd (BHEL) of India announced on 27 December the successful modernization of the first of three 60 MW units at the 180 MW Baira Siul hydropower plant in the northern Indian state of Himachal Pradesh. India's state-owned equipment manufacturer was contracted by NHPC, the state hydropower producer, to renovate the entire electro-mechanical equipment of the three units, for which it was the original supplier. Renovation and modernization of the other two units is at various stages of execution.
机译:印度巴拉特重型电气有限公司(BHEL)于12月27日宣布,在印度北部喜马al尔邦邦的180 MW Baira Siul水电站成功完成了三个60 MW机组中的第一台的现代化改造。印度国有设备制造商与该国水电生产商NHPC签约,以翻新这三个机组的全部机电设备,这是该设备的原始供应商。其他两个单元的改造和现代化处于执行的各个阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号