首页> 外文期刊>The international journal on hydropower & dams >Morocco's Bin El Ouidane and Ait Ouarda dams to be rehabilitated
【24h】

Morocco's Bin El Ouidane and Ait Ouarda dams to be rehabilitated

机译:摩洛哥的Bin El Ouidane和Ait Ouarda大坝将得到修复

获取原文
获取原文并翻译 | 示例
           

摘要

Morocco's state power and water utility Office National de I'Elec-tricite et de I'Eau Potable - Branche Electricite (ONEE-BE) invites sealed bids from qualified contractors by 25 March for the design, supply, installation and commissioning of hydro-mechanical and electrical works at the Bin EI Ouidane and Ait Ouarda dams located on the river EI Abid in the north-central region of Beni Mellal-Khenifra. The contracted work, which is expected to take 18 months, is to be financed from a loan from the European Bank for Reconstruction and Development. The EBRD agreed in November 2015 to provide a sovereign guaranteed loan of up to €35 million to finance the ONEE Hydro Rehabilitation Project, which is designed to extend the lifespan of its hydropower plants, enhance their production and efficiency, as well as improve safety and climate resilience at various dams.
机译:摩洛哥国家电力和水公用事业办公室National de I'Elec-tricite et de I'Eau便携式-Branche Electricite(ONEE-BE)邀请合格承包商在3月25日之前进行密封投标,以设计,供应,安装和调试水力机械位于贝尼·梅拉尔-凯尼夫拉(Beni Mellal-Khenifra)中北部地区的EI Abid河上的Bin EI Ouidane和Ait Ouarda大坝的水电工程。合同工期预计为18个月,将由欧洲复兴开发银行提供贷款提供资金。欧洲复兴开发银行于2015年11月同意提供高达3500万欧元的主权担保贷款,以资助ONEE水力修复项目,该项目旨在延长其水力发电厂的使用寿命,提高其水力发电效率,提高安全性和各种大坝的气候适应能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号