...
首页> 外文期刊>The international journal on hydropower & dams >Fifth upgraded unit at Iron Gates I resumes operation
【24h】

Fifth upgraded unit at Iron Gates I resumes operation

机译:铁闸I的第五个升级单元恢复运行

获取原文
获取原文并翻译 | 示例
           

摘要

The upgraded A2 unit at the Iron Gates (Đjerdap) 1 hydropower plant on the Danube has been put back into service following rehabilitation by Power Machines of Russia. A ceremony to mark the occasion was held in late November in the presence of the Minister of Mining and Energy of Serbia, Aleksandar Antic, the Acting Director of Serbia's state-owned power utility Elektro-privreda Srbije (EPS), Milorad Grcic, and the Russian Ambassador to Serbia, Aleksandr Botsan Kharchenko.
机译:多瑙河的Iron Gates(Đjerdap)1水电厂的升级后的A2机组在俄罗斯Power Machines进行修复后已重新投入使用。 11月下旬,塞尔维亚矿业和能源部长Aleksandar Antic,塞尔维亚国有电力公司Elektro-privreda Srbije(EPS),Milorad Grcic和俄罗斯驻塞尔维亚大使Aleksandr Botsan Kharchenko。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号