Swiss power producer and supplier Repower AG invites bids by 7 January 2020 for the engineering, design, fabrication and supply as well as on-site assembly and commissioning of three Pelton machine sets and a distribution pipeline for the modernization of the 27 MW Robbia hydropower plant in the southeastern canton of Grisons. Repower is seeking the supply of three 12 MW units to operate under a head of 600 m with a flow rate of 2.2 m~3/s, and a single distribution pipe with three branches to allow for flow of 6.6 mVs with pressure of 66 bar, one expansion pipe with fitting, and one emptying device and measuring socket, according to a tender notice published on the EU's procurement website, TED. The contracted work is expected to be completed within 56 months of contract signing.
机译:瑞士电力生产商和供应商兑换奖励奖金于2020年1月7日的工程,设计,制造和供应以及三个佩尔顿机器套装的现场装配和调试,以及27 MW Robbia水电站现代化的分销管道在格劳斯的东南部。雷尔正在寻求三个12 MW单位的供应,以600米的头部运行,流速为2.2米〜3 / s,单个分配管,具有三个分支,允许具有66杆压力的6.6 mV的流量,一个带拟合的一个膨胀管,以及一个排空装置和测量插座,根据欧盟的采购网站发布的招标通知。预计合同工作将在合同签署的56个月内完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号