...
首页> 外文期刊>The international journal on hydropower & dams >Design and construction of Pakistan's Marala hydropower project
【24h】

Design and construction of Pakistan's Marala hydropower project

机译:巴基斯坦马拉拉水电项目的设计与施工

获取原文
获取原文并翻译 | 示例
           

摘要

The Marala project, a low head run-of-river type powerhouse, has been constructed on the Upper Chenab canal with a plant capacity of 7.64 MW in a bypass arrangement. The location is shown in Fig. 1. The site is located about 1047 m downstream of the main head regulator of the Upper Chenab canal. The barrage is located about 48 km upstream of the Khanki headworks, and about 25 km north of Sialkot City. The area is part of the Indo-Gangetic plains and is predominantly flat. Sialkot experiences warm summers and cold winters.
机译:Marala项目是一个低头河流式型厂家,已经在上层康国运河上建造,铺设装置的植物容量为7.64兆瓦。该位置如图1所示。该部位位于上康国运河的主头调节器下游约1047米。拦河坝上游约48公里的Khanki Headworks,距离Sialkot市以北约25公里。该地区是印度难潮平原的一部分,主要是平坦的。 Sialkot体验温暖的夏天和寒冷的冬天。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号