...
首页> 外文期刊>The international journal on hydropower & dams >Re-designing feasibility studies to address private sector funding needs
【24h】

Re-designing feasibility studies to address private sector funding needs

机译:重新设计可行性研究,以解决私营部门的资金需求

获取原文
获取原文并翻译 | 示例
           

摘要

A feasibility study for the Magwagwa multipurpose dam development project (MMDP) incorporating hydropower, water supply, catchment management and irrigation, was undertaken by SMEC in 2011. [SMEC, 2011]. The project is. In Nyamira County, Nyanza Province, in the southeast of Kenya. It will incorporate a 95 m-high, 450 m long CFRD, and the power-plant will have a capacity of 120 MW, with an expected annual production of 510 GWh/year. It will also supply water to 19 service centres, including Magwagwa town, and water for irrigation and fisheries. It was expected that the electricity generated from the plant would to be sold to the Kenya Power and Lighting Company (KPLC). The initial cost for the project was approximately KES 90 billion (approximately US$ 837.6 million).
机译:2011年,SMEC采用了玛瓦瓦瓦多用途大坝开发项目(MMDP)的可行性研究,该项目加入水电,供水,集水机会管理和灌溉。[SMEC,2011]。 该项目是。 在尼亚扎省尼亚拉县,在肯尼亚东南部。 它将融合95米高,450米长的CFRD,电厂将容量为120兆瓦,预计年产510 GWH /年。 它还将为19家服务中心提供水,包括Magwagwa镇,以及灌溉和渔业的水。 预计从工厂产生的电力将销往肯尼亚电力和照明公司(KPLC)。 该项目的初始成本约为900亿(约8.376亿美元)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号