...
首页> 外文期刊>The international journal on hydropower & dams >Private investment in small hydro to ensure power for water supply in DRC
【24h】

Private investment in small hydro to ensure power for water supply in DRC

机译:私人投资于小水电以确保刚果民主共和国的供水

获取原文
获取原文并翻译 | 示例
           

摘要

The investment costs of the Tshilomba plant, including the mini-distribution network, are estimated at € 19 million. According to the mixed financing model, the levelized cost of electricity is about € 0.2/kWh. The share of public financing of the project by KfW is almost one third of the total investment cost to be in line with the surveyed ability to pay of the consumers living in the load centre. This represents a significant improvement in comparison with the status quo, in which the generation costs are typically in the range of € 0.40 to 0.50/kWh.
机译:Tshilomba工厂的投资成本,包括小型分销网络,估计为1900万欧元。根据混合融资模型,平均电力成本约为0.2欧元/千瓦时。德国复兴信贷银行对该项目的公共融资份额几乎占总投资成本的三分之一,这与调查的居住在负荷中心的消费者的支付能力相符。与现状相比,这是一个重大改进,在这种情况下,发电成本通常在0.40至0.50 / kWh的范围内。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号