Some of the challenges encountered during the construction of the Memve'ele project have been described here, with a special focus on the geotechni-cal aspects. Most of the civil works at the project have now been completed. The main dam, the headrace channel and the forebay have successfully been impounded. The next step will be the completion of the power-plant and its electro-mechanical equipment, so as to be ready to deliver the first power from the plant. The first unit was pre-commissioned at the end of 2016, and the other three will be ready to begin operation over the next six months.
机译:在此描述了Memve'ele项目在建设过程中遇到的一些挑战,其中特别着重于地质方面。该项目的大部分土建工程现已完成。主水坝,头水渠和前湾已被成功扣押。下一步将是发电厂及其机电设备的竣工,以便为发电厂提供第一批电力。第一个机组已于2016年底进行了调试,其他三个机组将准备在未来六个月内开始运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号