The European Bank for Reconstruction and Development (EBRD) has cancelled a €65 million loan to Macedonia's state power producer Elektrani Na Makedonija (ELEM) for construction of the 68 MW Boskov Most hydropower project on the river Mala in the Mavrovo National Park. The EBRD announced on 17 January that it had cancelled the loan, which was approved in late 2011 and available for five years, because "conditions for disbursement were not met".
展开▼
机译:欧洲复兴开发银行(EBRD)取消了对马其顿国家电力生产商Elektrani Na Makedonija(ELEM)的6500万欧元贷款,用于在马夫罗沃国家公园的马拉河上建设68兆瓦的Boskov Most水电项目。欧洲复兴开发银行于1月17日宣布取消了该笔贷款,该笔贷款于2011年底获批,有效期为5年,因为“未满足支付条件”。
展开▼
机译:具有附加功能的在线房屋贷款比较计算器,允许用户确定将太阳能光伏系统的成本增加到原始房屋贷款金额中的净效果。 Solar Home Loan Calculator允许用户将2种不同的贷款金额与2种不同或相等的利率进行比较,以贷款支付的形式显示净损失或收益。该计算器还允许用户以美元为单位输入由太阳能光伏系统产生的节电,作为额外的贷款还款,说明整体房屋贷款应付利息,贷款期限和LVR减少。