...
首页> 外文期刊>International Journal on Hydropower & Dams >Drin river dams to be refurbished in Albania
【24h】

Drin river dams to be refurbished in Albania

机译:德林河大坝将在阿尔巴尼亚进行翻新

获取原文
获取原文并翻译 | 示例
           

摘要

Ciltug Isi Sanayi ve Ticaret of Turkey has been awarded a contract to carry out the rehabilitation of the spillway gates and stoplogs at the Komani and Fierza hydropower dams on the river Drin in northern Albania. The Turkish group won international tenders for the two contracts with bids worth €6.317 million and €6.02 million, respectively, against rival bids of €8.43 million and €7.47 million from Camuna Idroelettrica of Italy and € 10.37 million and € 10.29 million from Andritz Hydro.
机译:土耳其的Ciltug Isi Sanayi ve Ticaret与阿尔巴尼亚北部Drin河上的Komani和Fierza水电站大坝的溢洪道闸门和停顿坝修复工程已获得合同。土耳其集团赢得了这两个合同的国际招标,分别标价631.7万欧元和602万欧元,而意大利的Camuna Idroelettrica的标书分别为843万欧元和747万欧元,而安德里茨水电公司的标书为1037万欧元和1029万欧元。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号