首页> 外文期刊>International Journal on Hydropower & Dams >Small hydro development goes ahead in Matagalpa, Nicaragua
【24h】

Small hydro development goes ahead in Matagalpa, Nicaragua

机译:尼加拉瓜马塔加尔帕的小水电开发正在进行

获取原文
获取原文并翻译 | 示例
           

摘要

The San Martin hydroelectric project is a 5.8 MW run-of-river scheme being developed by Interamerican Hydroelectric Corporation (IHC) on the river Bijao in central Nicaragua. The scheme, located in the highlands of the department of Matagalpa, 250 km northeast of the capital Managua, has been designed by Costa Rica-based engineering consultancy Carbon Ingenieria, and is being co-financed by the Belgian Investment Company for Developing Countries (BIO), which in October 2017 approved a loan of US$ 9.7 million. The plant is expected to generate average annual output of 25 GWh, with electromechanical equipment supplied by Wasserkraft Volk of Germany. Construction began in early 2017, with current work ongoing on the dam and intake, the 3400 m-long low pressure conveyance, penstock, surge tank and powerhouse. San Martin is expected to be ready for commissioning by December 2018.
机译:San Martin水电项目是一个5.8 MW的河道运行计划,由Interamerican Hydroelectric Corporation(IHC)在尼加拉瓜中部的Bijao河上开发。该计划位于首都马那瓜东北250公里的马塔加尔帕省高地,由哥斯达黎加的工程咨询公司Carbon Ingenieria设计,并由比利时发展中国家投资公司(BIO)共同资助。 ),并于2017年10月批准了970万美元的贷款。该工厂的年平均产量预计为25 GWh,其机电设备由德国Wasserkraft Volk提供。建设于2017年初开始,目前正在进行有关大坝和取水口,3400 m长的低压输送装置,压力管道,调压罐和发电站的工作。预计圣马丁(San Martin)将于2018年12月开始调试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号