首页> 外文期刊>International Journal on Hydropower & Dams >Skagerak Energi awards a contract for small hydro refurbishment
【24h】

Skagerak Energi awards a contract for small hydro refurbishment

机译:Skagerak Energi授予小型水电翻新合同

获取原文
获取原文并翻译 | 示例
           

摘要

Rainpower has signed a contract with Skagerak Energi for the refurbishment of the 2.9 MW Bjordalen hydro plant in the Skien watershed in Hjartdal, in the southern Norwegian county of Telemark. The contract covers the refurbishment of the plant's single Francis turbine. Its subsidiary, Hymtak Controls, has meanwhile been awarded the contract for a new control system for the plant, the Norwegian-based hydro-power engineering group announced in late August. Hymatek will supply a new control system, AC distribution, turbine controller and new excitation, the company said. The refurbished plant is to be handed back to Skagerak Energi in the third quarter of 2017. The powerplant, which was commissioned in 1960, generates average annual production of 9.4 GWh, from a head of 49 m between Lake Skjesvatnet and Lake Brei-vatnet. It also draws water from the river Heai.
机译:Rainpower已与Skagerak Energi签署了一项合同,该合同将翻新挪威南部泰勒马克郡Hjartdal的Skien分水岭的2.9 MW Bjordalen水电站。该合同涵盖了工厂单台混流式水轮机的翻新工程。挪威水电工程集团在8月底宣布,其子公司Hymtak Controls已获得该厂新控制系统的合同。该公司表示,Hymatek将提供新的控制系统,交流配电,涡轮控制器和新的励磁系统。这座经过翻新的工厂将于2017年第三季度交还给Skagerak Energi。该电站于1960年投产,年平均产量为9.4 GWh,其位于Skjesvatnet湖和Brei-vatnet湖之间的水头高度为49 m。它还从Heai河汲水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号