...
首页> 外文期刊>International Journal on Hydropower & Dams >Peruvian mining group commissions 20 MW Rucuy plant
【24h】

Peruvian mining group commissions 20 MW Rucuy plant

机译:秘鲁矿业集团委托20 MW Rucuy工厂

获取原文
获取原文并翻译 | 示例
           

摘要

The polymetallic mining group Volcan Compania Minera, of Peru, commissioned in August a new hydropower plant, increasing its ability to meet its power supply from its own generation sources. The 20 MW Rucuy plant, on the river Chancay in the Lima region of Peru, entered into commercial operation on 9 August, according to the national grid operator COES. The run-of-river station was built at a cost of around US$ 48 million by owner-operator Empresa Administradora Chungar, a subsidiary of Volcan. It is equipped with two horizontal two-jet Pelton turbines, which were supplied by Andritz Hydro. The Austrian group also supplied the main inlet valves and the hydraulic pressure units. Civil works, including the main water intake structure and the powerhouse, were constructed by Energoproject Holding of Serbia.
机译:秘鲁的多金属矿业集团Volcan Compania Minera于8月启用了一座新的水力发电厂,以提高其依靠自己的发电来满足其电力供应的能力。根据国家电网运营商COES的说法,位于秘鲁利马地区Chancay河上的20 MW Rucuy电厂于8月9日投入商业运营。河流运行站是由沃尔坎的子公司所有者经营者Empresa Administradora Chungar花费约4,800万美元建造的。它配备了两个水平的两喷嘴Pelton涡轮机,由Andritz Hydro提供。奥地利集团还提供了主进气阀和液压单元。塞尔维亚的Energoproject Holding建造了包括主要取水结构和发电站在内的土建工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号