...
首页> 外文期刊>The international journal on hydropower & dams >Contracts awarded for Indian rehabilitation schemes
【24h】

Contracts awarded for Indian rehabilitation schemes

机译:授予印度康复计划的合同

获取原文
获取原文并翻译 | 示例
           

摘要

India's Bharat Heavy Electricals Limited (BHEL) announced in early October that it had secured contracts worth around Rp 4300 million (about US$ 64.6 million) to rehabilitate and modernize two hydro plants. The company will carry out the design, engi- neering, manufacture, supply, dismantling, erection, testing and commissioning of critical parts of the turbines, generators, governors, control and instrumentation systems, protection, and balance of plant for six 60 MW units at the Balimela station of Odisha Hydro Power Corporation (OHPC) and the three 60 MW units of the Baira Siul facility of National Hydro Power Corporation (NHPC). The units at Balimela and Baira Siul have been in operation for more than 35 years and their renovation and modernization will result in the restoration of capacity, improvement in efficiency and reduction in auxiliary power consumption, in addition to leading to better plant availability, BHEL announced in October. Major equipment will be manufactured by BHEL's plants at Bhopal, Jhansi and Bengaluru.
机译:印度的巴拉特重型电气有限公司(BHEL)于10月初宣布,已获得价值约43亿印尼盾(约合6,460万美元)的合同,以修复和改造两个水电站。该公司将为六个60 MW机组进行涡轮机,发电机,调速器,控制和仪表系统的关键部件的设计,工程,制造,供应,拆除,安装,测试和调试。在奥里萨水电公司(OHPC)的Balimela电站和国家水电公司(NHPC)的Baira Siul工厂的三台60 MW机组中。 BHEL宣布,Balimela和Baira Siul的装置已经运行了35年以上,其改造和现代化将导致容量恢复,效率提高和辅助电力消耗的减少,此外还带来了更好的工厂可用性。在十月。 BHEL的工厂将在Bhopal,Jhansi和Bengaluru生产主要设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号