...
首页> 外文期刊>The international journal on hydropower & dams >Equipment ordered for Ust-Srednekanskaya plant, Russia
【24h】

Equipment ordered for Ust-Srednekanskaya plant, Russia

机译:为俄罗斯Ust-Srednekanskaya工厂订购的设备

获取原文
获取原文并翻译 | 示例
           

摘要

Power Machines of Russia has won a contract to supply the third unit for the Ust-Srednekanskaya hydro plant on the river Kolyma in the Magadan region of the Far East of Russia. The contract, which is valued at Rb 1.76 billion (US$ 28.5 million) and was awarded by RusHydro, the country's state-controlled hydropower producer, entails the manufacture, supply and supervision of installation of a turbine with capacity of 142.5 MW, a generator and an automated control system. Power Machines has said that it is scheduled to complete delivery by 2016 and to commission the unit by 2018.
机译:俄罗斯动力机器公司赢得了一份合同,为俄罗斯远东马加丹地区科利马河上的Ust-Srednekanskaya水电站提供第三台机组。该合同价值17.6亿卢比(2850万美元),由该国国有水电生产商RusHydro授予,涉及制造,供应和监督容量为142.5 MW的涡轮机(发电机)的安装,供应和监督。和一个自动控制系统。 Power Machines表示,计划于2016年完成交付,并于2018年投入使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号