...
首页> 外文期刊>International Journal on Hydropower & Dams >Peru inaugurates Runatullo Ⅱ and Ⅲ
【24h】

Peru inaugurates Runatullo Ⅱ and Ⅲ

机译:秘鲁成立RunatulloⅡ和Ⅲ

获取原文
获取原文并翻译 | 示例
           

摘要

Peru inaugurated the Runatullo Ⅱ and Runatullo Ⅲ projects on 29 May. The schemes will strengthen the energy security of the country, and benefit 85 000 families in the Mantaro Valley. The President, Ollanta Humala Tasso, officially opened the two 20 MW hydroelectric projects. Contracts for these plants were awarded the third international auction for the supply of electricity to the national grid with renewable energy resources. The Runatullo Ⅱ plant uses a flow rate of 7 m~3/s on the Runatullo river, with a gross head of 318.5 m, to generate 19.1 MW. The water is conveyed through a 606 m tunnel, followed by a 1520 m channel, then a 1918 m tunnel, and finally a penstock 566 m long.
机译:秘鲁于5月29日启动了RunatulloⅡ和RunatulloⅢ项目。这些计划将加强该国的能源安全,并使曼塔罗河谷的85000个家庭受益。总统Ollanta Humala Tasso正式启动了两个20兆瓦水电项目。这些电厂的合同获得了第三次国际拍卖,拍卖的是向国家电网供应可再生能源的电力。 RunatulloⅡ厂在Runatullo河上的流量为7 m〜3 / s,总水头为318.5 m,可产生19.1 MW。水被输送通过606 m的隧道,接着是1520 m的通道,然后是1918 m的隧道,最后是566 m长的压力管道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号