...
首页> 外文期刊>The international journal on hydropower & dams >Work begins at Manolo Fortich, The Philippines...
【24h】

Work begins at Manolo Fortich, The Philippines...

机译:在菲律宾的Manolo Fortich开始工作。

获取原文
获取原文并翻译 | 示例
           

摘要

Philippine hydropower producer Hedcor Inc has achieved two further milestones on the path towards its target of generating 2 TWh/year by 2020. In mid-May, the subsidiary of Aboitiz Power announced that construction work was underway on the 68.8 MW Manolo Fortich cascade in the province of Bukidnon in the Northern Mindanao region. A ground-breaking ceremony was held in late April for the Peso 12.5 billion (US$ 277 million) project, which will comprise the 43.4 MW Manolo Fortich 1 and 25.4 MW Manolo Fortich 2 plants.
机译:菲律宾水电生产商Hedcor Inc在实现其到2020年年产2 TWh /年的目标的道路上又实现了两个里程碑。5月中旬,Aboitiz Power的子公司宣布,位于菲律宾的68.8 MW Manolo Fortich级联正在进行建设工作。棉兰老岛北部地区的布吉农省。 4月下旬,比索125亿欧元(2.77亿美元)项目举行了动工仪式,其中包括43.4兆瓦的Manolo Fortich 1和25.4兆瓦的Manolo Fortich 2电厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号