...
【24h】

INTERNATIONAL NEWS

机译:国际新闻

获取原文
获取原文并翻译 | 示例
           

摘要

The 180 MW Nam Ngiep 2 hydro project in Xiangkhouang Province, northeastern Laos, was inaugurated on 2 October. The Kip 2.81 trillion (about USS 345 million) project began commercial operation in late September. It was constructed over a period of four years by a consortium of the China International Water & Electric Corporation (CWE) and the Lao state power utility, Electricite du Laos (EDL), under a 25-year Build, Own, Operate and Transfer concession signed in August 2011. CWE, a subsidiary of the China Three Gorges Corporation, holds a 90 per cent stake in the project company, Nam Ngiep 2 Power Company, with EDL holding 10 per cent. The plant is projected to produce average annual output of 723 GWh, which is to be sold to EDL under a power purchase agreement signed in October 2011.
机译:10月2日,位于老挝东北向香Xiang省的180 MW Nam Ngiep 2水电项目启动。 Kip 2.81万亿(约合3.45亿美元)项目于9月下旬开始商业运营。它是由中国国际水电总公司(CWE)和老挝国家电力公司老挝电力公司(EDL)联合进行的为期四年的建设,拥有,运营和转让特许权,为期25年。中国三峡集团公司的子公司CWE持有项目公司Nam Ngiep 2电力公司90%的股份,EDL持有10%的股份。该工厂预计将产生平均723 GWh的年产量,根据2011年10月签署的电力购买协议,该工厂将出售给EDL。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号