...
首页> 外文期刊>The international journal on hydropower & dams >Construction starts on Scotland's Kames hydro project
【24h】

Construction starts on Scotland's Kames hydro project

机译:苏格兰的Kames水电项目开始建设

获取原文
获取原文并翻译 | 示例
           

摘要

Gilkes Energy has announced that construction of the 0.9 MW Kames hydro project has begun. The scheme is on the east shore of Loch Awe, and is the first of a number of hydro projects to be developed by Gilkes Energy on the National Forest Estate, managed by Forestry Commission Scotland. The project has a classic high-head design, incorporating a single intake, high-pressure pipeline and a Gilkes twin-jet Pelton turbine in a purpose-built powerhouse.
机译:Gilkes Energy宣布0.9兆瓦Kames水电项目的建设已经开始。该计划位于尼斯湖东岸,是吉尔克斯能源公司在苏格兰国家林业委员会管理的国家森林庄园上开发的众多水电项目中的第一个。该项目采用经典的高扬程设计,在专门建造的发电站中采用了单进水高压管道和Gilkes双喷嘴Pelton涡轮机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号