...
首页> 外文期刊>International Journal on Hydropower & Dams >Optimization techniques for capital planning in hydro operations
【24h】

Optimization techniques for capital planning in hydro operations

机译:水利工程资本规划的优化技术

获取原文
获取原文并翻译 | 示例
           

摘要

Hydro asset managers are often faced with the need to select one capital investment or project over another, based on which investment brings the highest value to the corporation and/or mitigates the most asset-related risk. This article explores the usefulness of advanced optimization techniques, such as the Simplex method, for large portfolios of candidate asset investments subject to multiple time-variant and risk-informed constraints, as are typically found in hydro operations.
机译:水电资产管理者经常面临选择一项资本投资或项目而不是另一项资本投资的需求,基于这种投资或项目,可以为公司带来最高价值和/或减轻与资产相关的风险最大。本文探讨了高级优化技术(例如“单纯形法”)对于受多种时变和风险告知约束的大型候选资产投资组合的用处,如水电运营中通常会遇到的那样。

著录项

  • 来源
    《International Journal on Hydropower & Dams》 |2014年第4期|50-51|共2页
  • 作者

    B. Neijens;

  • 作者单位

    Copperleaf Technologies, 4170 Still Creek Drive, Suite 450, Burnaby BC, V5C 6C6, Canada;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号