...
首页> 外文期刊>International Journal on Hydropower & Dams >Studies go ahead for four Turkish schemes
【24h】

Studies go ahead for four Turkish schemes

机译:四项土耳其计划的研究正在进行

获取原文
获取原文并翻译 | 示例
           

摘要

DC Hidro Enerji, a subsidiary of the Turkish group Ronesans (Renaissance) Holding, has awarded Poeyry a contract to carry out feasibility studies and final design services for four storage projects with a combined installed capacity of around 740 MW in eastern Turkey. The contract, to be competed at the end of 2015, is to be implemented jointly with local partner Dolsar, Poeyry announced in late July. The contract includes feasibility studies, final design studies and tender specifications for civil structures (dam, power intake, power tunnel and penstocks, spillway and diversion structures) and related hydro-mechanical and electromechanical equipment.
机译:土耳其Ronesans(Renaissance)Holding集团的子公司DC Hidro Enerji与Poeyry签订了一份合同,为土耳其东部四个装机容量约为740 MW的储能项目进行可行性研究和最终设计服务。 Poeyry于7月下旬宣布,该合同将于2015年底竞标,将与当地合作伙伴Dolsar共同执行。该合同包括可行性研究,最终设计研究以及针对民用建筑(大坝,取水口,电力隧道和压力管道,溢洪道和引水结构)以及相关水力机械和机电设备的招标规范。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号