首页> 外文期刊>The international journal on hydropower & dams >Sayano-Shushenskaya powerplant resumes full operation
【24h】

Sayano-Shushenskaya powerplant resumes full operation

机译:Sayano-Shushenskaya电厂恢复全面运行

获取原文
获取原文并翻译 | 示例
           

摘要

The Sayano-Shushenskaya power-plant, Russia's largest hydro station, has resumed operation at full capacity, after completion of reconstruction work. The last of 10 new units for the 6400 MW powerplant, which was damaged in a major accident in 2009, was brought online on 12 November, according to owner-operator Rus-Hydro, the country's state-controlled hydropower producer. The reconstruction of the plant, on the Yenisei river in Russia's Khak- assia region, was carried out in three stages over five years, at a total cost of Rb 41 billion (US$ 880 million), involving the replacement of all units. The reconstructed power station "has regained the title of the country's best, and one of the world's best, hydroelectric power stations", according to President Vladimir Putin.
机译:俄罗斯最大的水电站Sayano-Shushenskaya电厂在重建工作完成后已恢复满负荷运行。据该国国有水电生产商鲁斯-海德罗(Rus-Hydro)称,该6400兆瓦发电厂的10个新机组中的最后10个已在2009年因重大事故而受损,于11月12日投入使用。该厂在俄罗斯哈克地区的叶尼塞河上进行了为期五年的分三个阶段的重建,总成本为410亿卢比(8.8亿美元),包括更换所有装置。弗拉基米尔·普京总统说,重建后的电站“已重新获得了该国最好的,世界上最好的水力发电站之一的称号”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号