首页> 外文期刊>The international journal on hydropower & dams >Construction begins on Bagatelle dam, Mauritius
【24h】

Construction begins on Bagatelle dam, Mauritius

机译:毛里求斯的Bagatelle大坝开始建设

获取原文
获取原文并翻译 | 示例
           

摘要

A new dam is under construction to create a reservoir, which will be used as a water retention system, to supply drinking water to the island of Mauritius. After extensive negotiations, Bauer Spezialtiefbau GmbH was awarded the contract for a cutoff wall, worth € 35 million, and work began in May this year. The Republic of Mauritius is an island state in the Indian ocean, some 2000 km off the southeast coast of Africa. Despite heavy rain, the nation faces problems with fresh water supply on the island, because of the lack of reservoir capacity. The Bagatelle dam project is expected to improve the situation.
机译:一个新的水坝正在建造中,以创建一个水库,该水库将用作保水系统,以向毛里求斯岛供应饮用水。经过广泛的谈判,Bauer Spezialtiefbau GmbH获得了一份三千五百万欧元的防渗墙合同,工程于今年五月开始。毛里求斯共和国是印度洋上的一个岛国,距非洲东南海岸约2000公里。尽管下了大雨,但由于缺乏水库容量,该国仍面临着岛上淡水供应的问题。 Bagatelle大坝项目有望改善这种状况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号