首页> 外文期刊>International Journal on Hydropower & Dams >EPC contract awarded for Vishnugad Pipalkoti, India
【24h】

EPC contract awarded for Vishnugad Pipalkoti, India

机译:印度Vishnugad Pipalkoti的Apps合同奖

获取原文
获取原文并翻译 | 示例
           

摘要

Bharat Heavy Electricals Limited (BHEL) has been awarded an Engineering, Procurement and Construction (EPC) contract for the electro-mechanical equipment for the 444 MW Vishnugad Pipalkoti run-of-river project on the Alak-nanda river, in the northeastern Indian state of Uttarakhand, The order, from THDCIL (formerly known as Tehri Hydro Development Corporation), includes four 111 MW units, with vertical Francis turbines and generators. Under the terms of the contract, announced on 28 October, BHEL will execute the contract in 48 months. The company's Bhopal unit is to supply the turbines and generators, while the transformers and control and monitoring system will be supplied by the Jhansi unit and Electronics Division in Bangalore. The northern region power sector division will carry out the installation and commissioning of equipment.
机译:Bharat Heavy Electricals Limited(BHEL)已获得印度东北部Alak-Nanda河上444 MW Vishnugad Pipalkoti河道工程的机电设备的工程,采购和建设(EPC)合同该订单来自THDCIL(以前称为Tehri Hydro Development Corporation),包括4台111 MW机组,其中包括立式弗朗西斯涡轮机和发电机。根据10月28日宣布的合同条款,BHEL将在48个月内执行合同。该公司的博帕尔部门将提供涡轮机和发电机,而变压器,控制和监视系统将由班加罗尔的詹西部门和电子部门提供。北部地区的电力部门将进行设备的安装和调试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号