首页> 外文期刊>International Journal on Hydropower & Dams >Design and construction of the Cambasi unlined headrace tunnel
【24h】

Design and construction of the Cambasi unlined headrace tunnel

机译:Cambasi无衬砌引水隧洞的设计与施工

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents the background for the construction of an unlined headrace tunnel at the Cambasi project in Turkey. The analysis and design process included a study of the rock mass characteristics, evaluation of possible leakage, and an estimation of the grouting requirements to control any leakage from the tunnel.
机译:本文介绍了土耳其Cambasi项目中无衬砌的头道隧道的建设背景。分析和设计过程包括对岩体特征的研究,可能的渗漏评估以及对控制隧道渗漏的注浆要求的估算。

著录项

  • 来源
    《International Journal on Hydropower & Dams》 |2014年第6期|86-89|共4页
  • 作者

    H.H. Balci; M. Eroez; R. Pamuk;

  • 作者单位

    Enerjisa Enerji UEretim A.S, Sabanci Center Kule-2, 34330 4. Levent, Istanbul, Turkey;

    Enerjisa Enerji UEretim A.S, Sabanci Center Kule-2, 34330 4. Levent, Istanbul, Turkey;

    Enerjisa Enerji UEretim A.S, Sabanci Center Kule-2, 34330 4. Levent, Istanbul, Turkey;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号