...
首页> 外文期刊>International Journal on Hydropower & Dams >Improving energy yield from Round 3 wind farms
【24h】

Improving energy yield from Round 3 wind farms

机译:提高第三轮风电场的能源产量

获取原文
获取原文并翻译 | 示例
           

摘要

A £2 million (€2.3 million) project has been initiated to help cut the cost of offshore wind power by increasing the energy yields from Round 3 wind farms: these would be situated up to 290 km from the UK coast. Known as the Wake Effects Measurement Project, it will provide detailed measurement data to help better understand how the wind behaves in complex situations offshore. This will help the industry to improve prediction, reduce financing costs and optimize wind farm layouts.
机译:已启动了一项200万英镑(230万欧元)的项目,通过增加第三轮风电场的能源收益来帮助降低海上风电的成本:这些风电场将位于距英国海岸最多290公里的位置。被称为“唤醒效应测量项目”,它将提供详细的测量数据,以帮助更好地了解风在海上复杂情况下的行为。这将有助于行业改善预测,降低融资成本并优化风电场布局。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号