...
首页> 外文期刊>International Journal on Hydropower & Dams >Basic studies awarded for Xalala plant, Guatemala
【24h】

Basic studies awarded for Xalala plant, Guatemala

机译:危地马拉Xalala工厂获得基础研究奖

获取原文
获取原文并翻译 | 示例
           

摘要

The technical feasibility studies and basic design for the 181 MW Xalala hydropower plant, on the Chixoy river, El Quiche region, Guatemala, were awarded by Instituto Nacional de Electrification (INDE) in November to the Brazilian company, Intertechne Consultores SA. Xalala is located downstream of the Chixoy plant, between Alta Verapaz and Quiche, and together with the Chulac and Serchil projects, are currently considered the best schemes for development in the country.
机译:危地马拉El Quiche地区Chixoy河上的181 MW Xalala水电厂的技术可行性研究和基本设计已于11月由巴西国家电气化研究所(INDE)授予巴西Intertechne Consultores SA公司。 Xalala位于Chixoy工厂的下游,位于Alta Verapaz和Quiche之间,目前与Chulac和Serchil项目一起被认为是该国最佳的发展计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号