...
首页> 外文期刊>International Journal on Hydropower & Dams >Belo Monte: a scheme to enhance Brazil's socio-economic development
【24h】

Belo Monte: a scheme to enhance Brazil's socio-economic development

机译:贝洛蒙泰(Belo Monte):一项旨在提高巴西社会经济发展的计划

获取原文
获取原文并翻译 | 示例
           

摘要

Belo Monte is currently considered the most important hydro scheme in the Brazilian Government's 'Growth Acceleration Programme'. It has faced opposition from international NGOs in recent years, but as this article shows, a sensitive planning process, including good communications with local communities focusing on their rights and quality of life, has now led to widespread acceptance of the scheme. As well as providing an average of 4571 MW of firm energy, the project will provide some 20 000 direct job opportunities locally, and will enhance local infrastructure and industry. This paper gives an overview of technical, environmental and social aspects of the scheme.
机译:贝洛蒙特(Belo Monte)目前被认为是巴西政府的“增长加速计划”中最重要的水利计划。近年来,它遭到了国际非政府组织的反对,但是,正如本文所显示的那样,敏感的计划过程,包括与当地社区的良好沟通,着重于他们的权利和生活质量,现已导致对该计划的广泛接受。除了平均提供4571兆瓦的公司能源外,该项目还将在当地提供约2万个直接就业机会,并将改善当地的基础设施和产业。本文概述了该计划的技术,环境和社会方面。

著录项

  • 来源
    《International Journal on Hydropower & Dams》 |2012年第1期|p.37-40|共4页
  • 作者

    J.Pimentel;

  • 作者单位

    Norte Energia SA, SCN Quadra 4, Bloco B, Centra Empresarial Varig, Brasilia DF 70 714-900, Brazil;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号