...
首页> 外文期刊>International Journal on Hydropower & Dams >Challenging river diversion for the Laja 1 scheme, Chile
【24h】

Challenging river diversion for the Laja 1 scheme, Chile

机译:智利Laja 1计划面临的挑战性的引水

获取原文
获取原文并翻译 | 示例
           

摘要

A five-stage river diversion process for the Laja I scheme in Chile presented some particular challenges for the project: at each stage the diversion works had to be capable of safely passing a 20-year flood. The design of the diversion scheme had an impact on the design of other structures, and was critical for the schedule of the overall scheme. Laja 1 is now nearing completion, with reservoir impounding due to begin in March 2012. This paper looks at the reasons for the unusual river diversion concept, and the challenges, which have been successfully overcome.
机译:智利的Laja I计划分五个阶段进行分流,这给该项目带来了一些特殊的挑战:在每个阶段,分流工程必须能够安全地通过20年的洪水。改道方案的设计对其他结构的设计有影响,对整个方案的进度至关重要。 Laja 1现已接近完工,水库蓄水将于2012年3月开始。本文着眼于非常规引流概念的成因以及成功克服的挑战。

著录项

  • 来源
    《International Journal on Hydropower & Dams》 |2012年第1期|p.60-64|共5页
  • 作者

    F. Cippd; P. Diggelmann;

  • 作者单位

    Poeyry Energy Ltd, Hardturmstrasse 161, PO Box, 8037 Zurich, Switzerland;

    Poeyry Energy Ltd, Hardturmstrasse 161, PO Box, 8037 Zurich, Switzerland;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号