...
【24h】

Idico inaugurates Dak Mi 4

机译:Idico为Dak Mi 4揭幕

获取原文
获取原文并翻译 | 示例
           

摘要

Vietnam's Urban and Industrial Zone Development Investment Corporation (Idico) inaugurated on 10 May the Dak Mi 4 hydro project at Phuoc Xuan in the Phuoc Son district of Quang Nam province. The 190 MW project, in the Vu Gia-Thu Bon river system, comprises the 148 MW Dak Mi 4a upper plant, equipped with two 74 MW Francis turbines, and the 42 MW Dak Mi 4b lower plant, which has two 21 MW Francis turbines. All equipmentwas supplied by China's Dongfang Electric Corporation. The projectwill produce average output of more than 780 GWh/year. Some finance was sourced from local banks including PV Finance, the financing subsidiary of the state energy company Petrovietnam, with $50 million from foreign institutions.
机译:越南城市和工业区开发投资公司(Idico)于5月10日在广南省福顺县福顺县启动了Dak Mi 4水电项目。 Vu Gia-Thu Bon河系统中的190兆瓦项目包括148兆瓦的Dak Mi 4a上部电厂,配备了两台74兆瓦的弗朗西斯涡轮机,以及42兆瓦的Dak Mi 4b下部电厂,具有两台21兆瓦的弗朗西斯涡轮机。所有设备均由中国东方电气公司提供。该项目的年平均产量将超过780 GWh。部分资金来自当地银行,包括国家能源公司Petrovietnam的融资子公司PV Finance,以及来自外国机构的5000万美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号