...
首页> 外文期刊>International Journal on Hydropower & Dams >Ilarion ready for testing in Greece
【24h】

Ilarion ready for testing in Greece

机译:Ilarion准备在希腊进行测试

获取原文
获取原文并翻译 | 示例
           

摘要

Greece s national power utility PPC announced in mid-July that it intends to start trial operation of its llarion hydropower project at Kozani, in the northern province of Macedonia, before the end of the year.The plant, on the Aliakmon river, will have an installed capacity of 165 MW and is expected to generate approximately 330 GWh/year. Metka, the power engineering and construction subsidiary of Greek metals and engineering group Mytilineos, is the EPC contractor for the electromechanical part of the project. Alstom Hydro has supplied two 77.66 MW vertical Francis turbines, 85 MVA generators, main inlet valves and governing system for the project.
机译:希腊国家电力公司PPC于7月中旬宣布,它打算在今年年底之前开始在北部马其顿省科扎尼的拉里奥水电项目进行试运行。装机容量为165兆瓦,预计每年可产生330吉瓦时。 Metka是希腊金属和工程集团Mytilineos的电力工程和建筑子公司,是该项目机电部分的EPC承包商。阿尔斯通水电为该项目提供了两台77.66 MW立式混流式水轮机,85台MVA发电机,主进水阀和调节系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号