...
首页> 外文期刊>International Journal on Hydropower & Dams >Enlarged Cotter dam project progresses in Australia
【24h】

Enlarged Cotter dam project progresses in Australia

机译:澳大利亚扩大的Cotter大坝项目进展

获取原文
获取原文并翻译 | 示例
           

摘要

The enlarged Cotter dam is now under construction in the Australian Capital Territory, and will replace the existing dam which has inadequate storage capacity. Originally constructed in 1915, the existing dam had a capacity of just 4 GL. The new project includes: 1.A main dam about 85 m high, located approximately 100 m downstream from the existing Cotter dam. The main dam will be a high paste RCC dam with an embankment volume of slightly more than 1 x 106 m3 of concrete, a stepped downstream face, and a central primary free overfall spillway of about 100 m wide and a capacity of 5600 m3/s; 2.Two saddle dam embankments over saddles in the right abutment ridge; 3.A conventional outlet system with an intake attached to the upstream face of the dam and an embedded pipe outlet.
机译:扩建的科特大坝目前正在澳大利亚首都地区建设中,并将取代现有的水库,因为该库的存储能力不足。现有的大坝最初建于1915年,容量仅4 GL。新项目包括:1.一个主坝高约85 m,位于现有Cotter坝下游约100 m。主坝将是一座高粘贴RCC坝,路堤体积略大于1 x 106立方米的混凝土,台阶面朝下,中央的主要自由溢洪道约为100 m,流量为5600 m3 / s。 ; 2.在右基台山脊的鞍座上有两个鞍座堤坝; 3.传统的出水系统,其进水口连接至大坝的上游面,并带有嵌入式管道出水口。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号