...
首页> 外文期刊>International Journal on Hydropower & Dams >Revised feasibility study for Bakircay downstream plains irrigation project
【24h】

Revised feasibility study for Bakircay downstream plains irrigation project

机译:Bakircay下游平原灌溉项目的可行性研究修订

获取原文
获取原文并翻译 | 示例
           

摘要

This feasibility study for this scheme was awarded to Dolsar Engineering in February 2010 and the services are scheduled to be completed by June 2011. The Bakircay basin is in the western part of Turkey. Bakircay, which is the only water resource in the area, originates from the Gelembe hills, taking in several tributaries and discharging into the Aeagan Sea, next to Candarh Bay and town.
机译:该方案的可行性研究已于2010年2月授予Dolsar Engineering,服务计划于2011年6月完成。Bakircay盆地位于土耳其西部。 Bakircay是该地区唯一的水资源,其源于Gelembe山,吸收了一些支流,并排入毗邻Candarh湾和城镇的Aeagan海。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号